R3C08
This photo shows the central tower with the two cantilevered spans partially completed. When completed and connected to the decks on the adjacent towers, the cantilevered deck will have a clearance of 448 m and 475 m on each side of the central tower, giving a spacious waterway for ships entering into the Rambler Channel.
|