R3C04 Detail
of the steel gantry on top of the bridge tower. The strand-jacks
seen at the far end are mounted on a sliding platform. The two
steel tower heads have been initially positioned at this stage. A
pair of one-metre-thick concrete tie walls, one on each side, will
be place at the back of the tower head, securing them in position
and stiffening the top of the bridge tower.
|