R3C02
A detailed look at the top of the bridge tower. A steel gantry with two pairs of strand-jacks was erected on top of each tower to lift the 190-tonne steel tower heads on which the cable anchors are housed. The 4.5 m x 31 m slot on the top of the tower is for the placement of the tower heads.
|