PCT02
PUBLIC
HOUSING
With the ground floor completed and the slab of first floor still
under temporary support, the steel reinforcement fixing for the
first floor wall is almost completed. Timber forms will then be
erected after the steel is inspected by an engineer. Note the
special formwork used on the in situ reinforced concrete facade
on the external wall. The facade for the upper floors is constructed
using precast units instead of forming by in situ method
|