 |
TKO22
Cut-and-cover
tunnel between Hang Hau Station and Po Lam Station
This
section of the tunnel is of a twin-box design, constructed by cut-and-cover
method and measuring 12.5 m x 7 m. The casting process is arranged in
a 3-stage process (the base slab, the wall elements and the top slab).
The above photo shows the use of a pair of traveling tunnel forms for
the casting of the tunnel section.
Sheet pile walling and the strut arrangement are being used as
support for excavation
|