 |
GZ01
Guangdong Olympic stadium
The preparation of the 110-ton cantilever trusses before lifting to the
roof level for installation. The trusses arrived on site in three or four
smaller sections prefabricated off-site and connected into one piece in
situ
|
¡@
¡@
|