CR07 The
overall layout of the site on June 1996. At this stage, the basic
structure of the podium had been formed. Since most of the
basement structure was constructed using a top-down technique,
there was no activity until a later stage, when the podium
structure was completed and access to the ground was made
available for the basement excavation.
|