CR03

Close up showing the twin drum cutter set. A 150-millimetre suction pipe is placed between the drum cutters. The excavated soil or gravel is being sucked out from the trench together with the bentonite slurry. The slurry is then pumped to the bentonite treatment plant where the soil and gravel are removed by a filtration process.