A25

The main outside link to the airport terminal: the Ground Transportation Centre (GTC) and related passenger unloading facilities. On the right side of this photo is the terminal building with the passenger unloading deck still under construction. On the left is the GTC, basically completed. A series of linking bridges will be built afterward, connecting the two facilities together.